Our case studies are made up of a selection of some of our most exciting and innovative projects. See below how we have delivered projects to our varied customer base across the UK. These solutions cover refrigeration systems, mechanical and electrical fit-out, design, installation and commissioning.
Revitalising Ryecroft Hall: A Vision for Sustainable RetailThe Ryecroft Hall development sets a high standard for eco-conscious retail spaces, demonstrating the power of sustainable engineering in reducing environmental impact. |
Critical Control Pharmaceutical ChillerOur client, Avarto Bertelsmann requested our support on a critical, temperature-controlled facility for a range of high-value pharmaceutical stock. |
Tesco Metro Caxton Gate, New Street, BirminghamCarter Synergy overcame significant challenges during a recent refit of a Tesco Metro site in Central Birmingham. |
Cheese production facility Plant ReplacementA major client based at Leek in Staffordshire requires a significant amount of cooling for their cheese production facility. |
L Shape Wholesale FreezerCarter Synergy has a number of key clients, one of which is a large food wholesaler and distributor based in Birmingham. |
Integrated Transcritical CO₂ SolutionCarter Synergy was approached by key client The Co-operative Group (TCG) to adapt our integrated CO₂ solution for trial in their estate. |
Industrial application of transcritical CO₂This industrial application of transcritical CO₂ has allowed us to demonstrate that this technology not only has a home in larger applications but it can be very cost effective. |
ME&R Installation at OpenwoodgateCarter Synergy has recently completed a new store for the Central England Co-operative at their site at Openwoodgate, Belper. |
New Build Installation for Total ProduceRefrigeration Installation including cold rooms, refrigeration plant, leak detection, alarm & monitoring, air conditioning and ventilation. |
New Build and Extension to Existing PremisesRefrigeration installation including cabinets, coldrooms, refrigeration plant, leak detection, alarm & monitoring system and ventilation. |
Integrated CO₂ Convenience Refrigeration InstallationThe purpose of this project was to bring CO₂ refrigeration to the BP estate and ensure the maximum value and benefit in terms of environmental impact was achieved. |
The Prestigious Birmingham Wholesale MarketCarter Synergy, being a Birmingham based company are very proud to have been awarded a number of Full Design & Build projects for a large number of the Market traders. |
High Specification Dental Education CentreA £1.5m London dental education centre (LonDEC) to form part of the King’s College London Dental Institute. |