Asia Pacific Refinery Decreases Energy Costs by 1.5%

Added: Over a year ago by KBC

Visual MESA® Energy Real Time Optimiser provides quick win solutions.

The Challenge

An Asia Pacific refinery was looking to increase its margins. The plan was to take a two-pronged approach. One program would focus on refinery optimisation. The other program would focus on energy optimisation.

Solution

By using Petro-SIM® simulation software and Visual MESA Energy Real Time Optimiser, KBC determined the estimated benefits for each proposed project. They then narrowed down the profit improvement options to four opportunities that promised quick wins.

The Results

The project reduced refining costs due to real time optimisation provided by Visual MESA Energy Real Time Optimiser. The result was the operator reducing energy costs by 1.5 %. After developing the RASCI matrix, the operator saved an additional 0.3%.

Follow your favourite employers
Save jobs to your shortlist
Receive personalised alerts
Access our live webinars
Register now
On the move? Download The App
Gradcracker Logo
Gradcracker Limited, October House, Long Street, Easingwold, York, YO61 3HX
01347 823822 | info@gradcracker.com | Company registration number: 6370348
© 2007 - 2024 Gradcracker Limited
Gradcracker and Cookies
We use cookies to ensure that we give you the best experience on our website.
If you continue we'll assume that you are happy to receive all cookies from Gradcracker.
Continue
Learn more