Furnace lance waste water pipe sizingRB Group’s client was experiencing lack of water flow to the lance supplying their furnaces with waste water. The client required a flow of 20 m³/hr to each furnace for a total of 60 m³/hr in the main line. |
|
|
|
|
Trewithen DairyRB Group provided comprehensive engineering and management support for the £12 million upgrade project of Trewithen Dairy, ensuring the successful expansion of the dairy’s operations. |
|
|
|
|
Celebrating safety excellence with GüGü Indulgent Foods Limited has partnered with RB Group to deliver a new advanced manufacturing facility to create patisserie-inspired, indulgently layered desserts. |
|
|
|
|
Paper recyclingRB Plant was engaged as engineering consultants for this major paper recycling project that delivered significant cost savings and environmental benefits. The project achieved a 60% reduction in transportation requirements, leading to lower operational costs and a decreased carbon footprint. |
|
|
|
|
API process upgrade projectRB Group was awarded design works November 2012 Facility shutdown for the start of upgrade May 2013. Partial handover to make product 1, July 2013. Final handover to make product 2, December 2013 API Potent Drug Facility Equipment, facility and utility upgrades to make products for a new customer Detail design, HAZOP, Construction Management, Validation. |
|