Portsmouth Academy
Client: Portsmouth City Council
Description: New build school block and refurbishment of existing areas
Design Basis: Pre-Designed
Location: Portsmouth
Project Value: £4.24 Million
Design Scope:
Full mechanical services, including: Space heating via underfloor heating and air source heat pump, domestic hot and cold water, mechanical and natural ventilation, above ground drainage, automatic controls.
Regent House
Client: Lorne Stewart
Description: New build office and residential development
Design Basis: Design and Build
Location: London
Project Value: £40 Million
Design Scope:
Mechanical services design support for: Space Heating, domestic hot and cold water, ventilation, central plant sizing and selections, above ground drainage.
Zero Carbon Strategy
Client: Tendring Borough Council
Description: Carbon reporting for the Council and whole district and provide a strategy to be a net zero carbon authority
Location: Essex
Works Scope:
- Calculate Scope 1, 2 and 3 carbon emissions for the local authority
- Identify the carbon emissions for the whole Tendring district
- Prepare a strategy to reduce direct and indirect carbon emission
- Advise on policies to collect future emissions data
The Forge
Client: Paul Earl Ltd
Description: Major refurbishment of existing building
Design Basis: Design and Build
Location: Woking (Surrey)
Construction Value: £15.0 Million
Design Scope:
Electrical services design, including: Electrical distribution, general & emergency lighting, coordination of specialist services, 3D revit building modelling.
Airbus Building 45
Client: SSE Contracting
Description: Replacement of office air conditioning and ventilation
Design Basis: Design and Build
Location: Portsmouth
Works Value: £500,000
Works Scope:
Mechanical and electrical services design, including: Building thermal modelling and cooling load calculations, VRF air conditioning, mechanical ventilation, electrical power supplies.
Hospitals Lighting Replacement Feasibility Studies
Client: Southern Health NHS Foundation Trust
Description: Feasibility studies for the replacement of lighting across 11 hospital sites.
Location: Hampshire
Works Scope:
Full electrical services, including: Site survey of existing lighting installations, proposals for new energy efficiency LED lighting, budget installation works costs, calculations for energy and carbon emissions saving, and investment payback period, advice on sources of external funding.
Longdean Lodge
Client: Portsmouth City Council
Description: New build supported living development for adults with learning difficulties
Design Basis: Pre-Designed
Location: Portsmouth
Construction Value: £5.0 Million
Design Scope:
Full mechanical services, including: Space heating via ground source heat pump, domestic hot and cold water, mechanical and natural ventilation, above ground drainage, automatic controls.
Settles Street
Client: Paul Earl Ltd
Description: Refurbishment and extension to provide new office space
Design Basis: Design and Build
Location: London
Construction Value: £15.0 Million
Design Scope:
Electrical services design for: Electrical distribution and specialist services coordination.
Stansfeld Park
Client: Touch Building Services
Description: New build office and education development
Design Basis: Design and Build
Location: Oxford
Construction Value: £15.0 Million
Design Scope:
Mechanical services design for: Space heating via underfloor heating and air source heat pump, domestic hot and cold water, mechanical and natural ventilation, above ground drainage.
Oakdene House
Client: Portsmouth City Council
Description: Major refurbishment to provide supported living facilities for adults with learning difficulties
Design Basis: Pre-Designed
Location: Portsmouth
Construction Value: ££1.0 Million
Design Scope:
Full mechanical services, including: Space heating, domestic hot and cold water, central plant design, mechanical ventilation systems, above ground drainage, building management system.