Major Hospital De-Steaming and Decarbonisation Strategy
GPJ were appointed to develop concept designs and cost estimates for the de-steaming of a large operational hospital. The existing site utilised central steam generation for heating and hot water, with ageing infrastructure and significant energy losses associated with the existing steam systems.
Institute For Animal Health
GPJ Consulting Engineers were Mechanical, Electrical and Public Health Consultants for research facilities in Guildford, Surrey. The complex M&E installations for the ISO 10 & 11 buildings were designed by GPJ Consulting Engineers who also carried out the project management of both developments.
Flowrider Attraction
GPJ Consulting Engineers were employed by the Retallack Resort to carry out a survey and re-design of the ride’s protective safety cushions. The artificial surfing wave ride was installed after many years of heavy use has seen the protective foam crash pads and vinyl outer covering wear out.
Ministry of Defence
GPJ Consulting Engineers were commissioned to carry out a full site Mechanical and Electrical Condition survey on 3 of the South West’s main Ministry of Defence shore based training establishments. Teams of engineers visited every building on each site photographing and commenting on the condition of the plumbing, heating, ventilation, electrical and alarm systems.
Lighthouse Apartments
GPJ Consulting Engineers were appointed directly by the Client to provide a full detailed mechanical and electrical design for the refurbishment of the existing hotel into 14 luxury apartments overlooking the famous Fistral Beach.
RMA Sandhurst
The Royal Military Academy at Sandhurst is the UK’s home of Army officer training. This 200-year old building was in need of a refurbishment and required a new roof along with various M&E upgrades to future proof the building for many years to come.
Gllyngdune Gardens
GPJ Consulting Engineers were appointed by Carrick Leisure to provide M&E designs and ongoing project supervision for this exciting heritage project. The original Gardens and Orangery were constructed in 1907 and have generally remained the same over the years. The Client felt that the building could be upgraded to suit a more diverse audience.
Splash Leisure Pool
Greenwich Leisure Limited (GLL) has a 25-year operational lease on a number of leisure centres in the South West of England. The Splash Leisure pool at Bude represented a typical case where capital plant was up for replacement. GPJ Consulting Engineers worked closely with GLL to replace key plant and to incorporate new Building Management Controls.
Pumped Storage
A pumped storage power generation system utilises a body of water pumped to a height and released when required through hydro-electric turbines to generate a large amount of electrical energy over a short period to act as a buffer to assist the power grid with peaks. GPJ Consulting Engineers are actively researching and developing schemes which utilises redundant deep shaft mines to provide the high and low level storage. This minimises surface disruption.
Falmouth University
GPJ Consulting Engineers were appointed by the University Estates Team to work alongside the other members of the project team to provide a fully designed Mechanical and Electrical installation for the new 1000 sqm Fox 4 Creative Arts Building.