Our scope of work has included the connection design, fabrication and erection of c.2,700 tonnes of structural steelwork, delivered from both our Dalton and Lostock production facilities. We captured the journey of some of the roof trusses being loaded at Tilbury Docks, making their way through the centre of London and arriving at the stadium for installation.